Contact

 

Call us or contact our callback service here:

BU Power Systems News

Ground-break­ing cer­e­mo­ny at BU Pow­er Sys­tems: Expan­sion of the logis­tics cen­tre in Ibbenbüren

By 10. September 2024 No Comments

BU Pow­er Sys­tems, provider of cus­tomised dri­ve solu­tions and the world’s largest dis­trib­u­tor of Perkins engines, is send­ing a clear sig­nal for future growth and sus­tain­able devel­op­ment with the ground-break­ing cer­e­mo­ny. ‘The expan­sion of the logis­tics cen­tre by 900 square metres is an impor­tant step towards meet­ing the increas­ing demands of the indus­try and fur­ther increas­ing the effi­cien­cy of our process­es,’ empha­sis­es Prof. Dr.-Ing. Carsten Bück­er, Man­ag­ing Part­ner of BU Pow­er Systems.

‘This expan­sion under­lines our com­mit­ment to progress and effi­cien­cy,’ adds Jan-Sebas­t­ian See­ber, Man­ag­ing Direc­tor of BU Pow­er Sys­tems. ‘With the addi­tion­al stor­age capac­i­ty and improved infra­struc­ture, we are not only opti­mis­ing our inter­nal process­es, but also offer­ing our cus­tomers an even bet­ter ser­vice. This invest­ment strength­ens our posi­tion as a lead­ing com­pa­ny in the pro­vi­sion of dri­ve solu­tions and at the same time improves cus­tomer sat­is­fac­tion through increased reli­a­bil­i­ty and avail­abil­i­ty of our prod­ucts. It was par­tic­u­lar­ly impor­tant to us to equip the hall exten­sion with mod­ern tech­nol­o­gy for the future today — from a pho­to­volta­ic sys­tem, addi­tion­al employ­ee car park­ing spaces — a large num­ber with charg­ing points for elec­tric cars — to an advanced sprin­kler sys­tem for fire pro­tec­tion for the new build­ing and the entire exist­ing property.’

The com­pa­ny founder, Josef Bück­er, along with the project man­agers Niklas Deit­ing, Com­mer­cial Direc­tor, and Torsten Ger­rit­sen, project leader at BU Pow­er Sys­tems, were also on site. Rep­re­sent­ing Köster GmbH, the com­pa­ny respon­si­ble for the con­struc­tion, were Man­ag­ing Direc­tor Björn Bon­gartz , Site Man­ag­er Jan Malik, and Plan­ning Coor­di­na­tor Jen­nifer Trabant.

Com­ple­tion of the exten­sion and sub­se­quent oper­a­tion are planned for April 2025.

Ground-breaking ceremony for new warehouse of BU Power Systems in Ibbenbüren